Construction Methodology for Underground Services Protection

Purpose of below safety method statement is to provide instructions for ensuring the safe operations involved with ground penetrations so that underground services are not damaged and also to ensure the safety of workers. Overall the project manager is having responsibilities for the implementation of this standard safety procedure. Hazard Identification and Risk Assessment a)… Read More »

Plastering Method Statement

Below is a precise plastering work method statement that is very useful for civil engineers to understand how best quality plaster work can be done. This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project civil specifications. Below are the plastering tools or plastering equipment involved in… Read More »

Flooring Installation Method Statement for Marble and Granite Tiles Installation

This flooring installation method statement covers the detailed procedure to be followed for supply & installation of Marble and Granite tiles on floor, stairs, walls and counters and other areas as per the schedule of finishes for the project. Civil site engineer shall ensure that all materials shall be delivered to site complying with approved… Read More »

HVAC Chilled Water Pump Installation Method Statement

Below is a precise hvac method statement that covers the CHW chilled water pump Installation Alignment and Balancing works applicable for any kind of mechanical project. Before start of work examine areas, equipment foundations, and conditions for compliance with requirements for installation and other conditions affecting chilled water pump performance. Do not proceed with pump… Read More »

Emergency Lighting Central Battery System Testing and Commissioning

This method of statement is to provide guidance in carrying out the testing and commissioning of central battery system which has been installed at the project, in accordance with the approved Project Quality Plan, contract specifications and Commissioning plan. Purpose of this method of statement is to control the testing and commissioning activities for the… Read More »

Electrical Installation Method Statement for Central Battery Emergency Lighting System

This document describes the electrical installation methodology for emergency lighting central battery system in any kind of project. Following this electrical installation method shall ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and project documents… Read More »

Water Filtration System Testing and Commissioning Method Statement

This method statement is applicable for Testing & Commissioning of Multimedia Water Filtration System which is part of domestic water supply system. The water filtration system is used to filter the suspended particles in the water and mostly in the residential and commercial building these are installed in the mechanical floor for the purpose of… Read More »

Variable Air Volume Installation Testing and Commissioning Method Statement

This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV installation and testing activities: Mechanical Tool Box Electric Drill Machine Step Ladders Threading… Read More »