This method statement covers on site installation of pre-fabricated ductwork system for kitchen exhaust ducting. Procedure defines the method that will make sure that prefabricated kitchen exhaust ducting including support/bracketing, in line equipment installation and final connections are correct and acceptable, and
Read Complete Method
The existing ground level varies between + 3.52 m DMD to + 4.29 m DMD. The working platform level for Double U wall is considered at the average ground level. A Double U channel beam wall with one layer of tie-back anchors
Read Complete Method
Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High
Read Complete Method
The mechanical site engineer / site supervisor will give necessary instructions to tradesmen (pipe fitters & duct installers) and provide necessary approved construction/shop drawings of latest revision along with coordinated layouts for ccu installation works. Following tools shall be required before starting
Read Complete Method
If you need to learn the method for installation of sanitary ware fittings, then you can use step wise procedure as per below method statement. Storage of Sanitary Fittings i) Upon completion of receiving QC inspection, segregate the sanitary ware model /
Read Complete Method