Installation Method Statement

Closed Control Units Installation Testing Commissioning Method Statement

Below is the best method statement that covers closed control units installation testing and commissioning on a project site. The mechanical site engineer / site supervisor will give necessary instructions to tradesmen (pipe fitters & duct installers) and provide necessary approved construction/shop drawings of latest revision along with coordinated layouts for ccu installation works. Following

Closed Control Units Installation Testing Commissioning Method Statement Read More »

HVAC Method Statements, Testing & Commissioning

Kitchen Exhaust Ducting Installation Method Statement

This method statement covers on site installation of pre-fabricated ductwork system for kitchen exhaust ducting. Procedure defines the method that will make sure that prefabricated kitchen exhaust ducting including support/bracketing, in line equipment installation and final connections are correct and acceptable, and conforms to the contract documents and specifications. Construction/ Project Manager is overall responsible

Kitchen Exhaust Ducting Installation Method Statement Read More »

HVAC Method Statements