Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat Exchanger’s as indicated unless deviations
Read Complete Method
This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when
Read Complete Method
Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the
Read Complete Method
Now you can download complete package for HVAC maintenance works. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of all hvac mechanical equipment’s and systems. Preventive maintenance is an essential part of any
Read Complete Method
If you are looking for preventive maintenance & breakdown maintenance program, plans, schedules and procedures then this is right place. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of electrical and mechanical equipment’s
Read Complete Method
This page is providing you some important guidelines for installing and maintaining the Y-Strainers. These tips shall help you in achieving the quality work and right first time. If you want to read a full method statement for strainer installation you can
Read Complete Method
This method is for installation and maintenance of wafer type butterfly valve or lug style butterfly valve with a cast iron body construction, SS stem and disc and either EPDM, BUNA-N or Viton liners. Although the procedure is specifically provided for bi-Torq
Read Complete Method
SCOPE OF THIS DOCUMENT COVERS BELOW MENTIONED BALANCING VALVES: DM921 & DMG921 DOUBLE REGULATING VALVE (DRV) DM931 & DMG931 DA931 & DAG 931 VARIABLE ORIFICE DOUBLE REGULATING VALVE (VODRV) DM941 & DMG 941 DA941 & DAG941 FIXED ORIFICE DOUBLE REGULATING VALVE (FODRV)
Read Complete Method