Method Of Statement

Electrical Wiring Installation Method Statement for Cables and Wires

Electrical Wiring Installation Method Statement for Cables and Wires

This method statement for electrical work shall help you understand the requirements before and during the cables and wires pulling process. The document is very helpful for MEP QA/QC engineers to develop the professional electrical method statement for their project. Below is the list of equipment / tools required for installation of cables and wires, […]

Electrical Wiring Installation Method Statement for Cables and Wires Read More »

Electrical Method Statements, Method Statements
cleaning and flushing of chilled water piping

Chilled Water Flushing Procedure for Cleaning and Flushing of the Chilled Water Piping System

Cleaning and flushing of chilled water piping system is very important part of any HVAC project. During the installation of chilled water piping there are many sources from which debris, dust and even metallic parts enter the system, therefore before putting the system in operation cleaning and flushing is mandatory requirement as part of the

Chilled Water Flushing Procedure for Cleaning and Flushing of the Chilled Water Piping System Read More »

HVAC Method Statements, Piping Works
access control system installation

Access Control System Installation

This access control system installation method statement provides steps for the installation of access control security system in order for operatives to understand the work to be executed, how it is to be executed while making references to other technical standards and relevant national/international standards. Method statement covers installation of ACS access control system including brackets,

Access Control System Installation Read More »

Electrical Method Statements, Method Statements
Fan Coil Unit (FCU) Installation Method Statement

Method Of Statement For Installation Of Fan Coil Units And Packaged Air Conditioning Units

Below is mechanical method statement that is prepared in order to make sure that site installation of all types of Fan Coil Units and Packaged Air Conditioning Units and associated refrigerant pipework is done as per applicable requirements and manufacturer instructions. Procedure defines the method that will be used to ensure that the FCU &

Method Of Statement For Installation Of Fan Coil Units And Packaged Air Conditioning Units Read More »

Duct Works, HVAC Method Statements, Piping Works

Method of Statement For Installation of Compressed Air Piping System for Chillers

1. PURPOSE This method of statement covers the on construction project site installation of the compressed air piping system for the operation of the chillers. This method statement covers following type of works: Power Plant Compressed Air Systems Factory assembled packaged air compressor complete with: –  Rotary screw air compressor –  Receiver –  Filtration facilities – 

Method of Statement For Installation of Compressed Air Piping System for Chillers Read More »

HVAC Method Statements, Piping Works

Chilled Water Pipe Insulation Method Statement

1. Purpose This method statement covers on site installation of thermal insulation for the complete chilled water piping system. 2. Scope This procedure is applicable for insulation of all supply and return mains, headers, branches, risers, drips, run-outs, pump suction and discharge, pipework, fittings, flanges, valves, expansion and movement devices, flexible connections associated with the

Chilled Water Pipe Insulation Method Statement Read More »

Method Statements, Piping Works