This method statement is applicable for collecting samples for concrete before and during concrete pouring activities and doing the standard tests. The aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the
Read Complete Method
Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and
Read Complete Method
This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on
Read Complete Method
The works mentioned in this Section shall apply to maintenance of road and shall be carried out manually or by machinery in such a way that the quality of end product meets the specified requirements. Whenever the Specification is not clear, good
Read Complete Method
Below is a sample job description for the role of M&E or MEP project coordinator. There can be additional roles and responsibilities depending upon the structure and size of the organization. MEP project coordinator normally is appointed by main contractor who looks
Read Complete Method
Reviewing the performance of any project or organization is key to its success and growth. This is best practice to conduct management review meetings for agenda of continuous improvement. Any organization that implements total quality management or TQM on their processes and
Read Complete Method
This procedure describes the requirements on statutory approvals to ensure all necessary regulatory and statutory project approvals are obtained in a timely manner to support engineering activities, construction activities and project completion etc. The process related to statutory/regulatory project approvals is described
Read Complete Method
The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed
Read Complete Method