Project Planning

quality assurance system

Download Project Quality Plan With All Forms & Checklists

Project quality plan is a document that covers all processes of a project life cycle in order to achieve the project quality objectives. Before start of any project quality management department prepares a specific project quality assurance plan. The basis for the plan is the project requirements that come in the form of tender documents […]

Download Project Quality Plan With All Forms & Checklists Read More »

Project Planning, Quality Management
Lifting Work Safety Method Statement

Lifting Work Safety Method Statement

This document covers the procedure to establish a method statement for all lifting activities for any kind of project especially laying of large transmission pipelines. The purpose of this document is to follow proper methodology and to carry out the activities and sequence of lifting works for laying of transmission pipelines at any kind of

Lifting Work Safety Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety, Project Planning, Risk Assessment
Construction Safety Procedure to Keep Children Away from Hazards

Construction Safety Procedure to Keep Children Away from Hazards

This construction safety instruction provides two-fold direction to assist in preventing children from entering the construction / mining site and being exposed to harm and to prevent underage personnel from working on the project. Procedure is applicable for all kind of projects especially in the context of children safety and child labor. Additional control measures

Construction Safety Procedure to Keep Children Away from Hazards Read More »

Occupational Health and Safety, Project Planning, Risk Assessment
Temporary Works Standard Safety Procedure

Temporary Works Standard Safety Procedure

The purpose of this procedure is to provide safework instruction for the safe erection, dismantling and structure design of temporary works. Definitions and Abbreviations Temporary Works: Any temporary structure required to construct a permanent structure or used to support a permanent structure. TWC: Temporary Works Coordinator TWD: Temporary Works Designer TWDC: Temporary Works Design Checker

Temporary Works Standard Safety Procedure Read More »

Civil Engineering Methods, Occupational Health and Safety, Project Planning, Risk Assessment

Construction Project Quality Plan Basic Requirements & Template

Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and specifications under the contract requirements. The CQCP provides means to maintain effective quality

Construction Project Quality Plan Basic Requirements & Template Read More »

Project Planning, Quality Management, Templates
Standard Procedure for Management of Construction Equipment Project Plant Assets

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when suitable hire/rental equipment is not available in the market place, and where an

Standard Procedure for Management of Construction Equipment Project Plant Assets Read More »

Civil Engineering Methods, Preventive Maintenance, Project Planning, Roadworks
Sample Job Description of Construction Project MEP Coordinator

Sample Job Description of Construction Project Best MEP Coordinator

Below is a sample job description for the role of M&E or MEP project coordinator. There can be additional roles and responsibilities depending upon the structure and size of the organization. MEP project coordinator normally is appointed by main contractor who looks after the coordination works of different subcontractors and main contractor. He works in

Sample Job Description of Construction Project Best MEP Coordinator Read More »

Project Planning, Quality Management
Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

The objective of this method statement is to set down the procedures that are involved in the safe erection, operation and dismantling of a slip form shuttering, applicable for the construction of core for the project building. Roles and Responsibilities Project manager has overall responsibility for the implementation of this method statement and to ensure

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Project Planning