Home » Method Statements » Pressure Testing

Pressure Testing

uPVC High Pressure Water Supply Piping System Installation Procedure

uPVC Pressure piping system

Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place for installation reference. This also …

Read More »

Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings

Download Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings  Download Package Contains the Method Statement + Checklists for Installation + Checklists for Testing + Inspection & Testing Plan + Risk Assessment    You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the …

Read More »

Download Method Statement For Installation & Testing Of Vacuum System

Download Method Statement For Installation & Testing Of Vacuum System  Download Package Contains the Method Statement + Checklist for Installation + Checklist for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files …

Read More »

Download Method Statement For Installation & Testing of Water Supply Piping System

Download Method Statement For Installation & Testing of Domestic Cold and Hot water supply Piping System and Accessories For Above & Below Ground Installations  Download package contains the Method Statement + Checklist for Under Ground Piping Installation + Checklist for Above Ground Piping Installation + Hydro Pressure Test Report + Inspection & Testing Plan +  Risk Assessment   You only need to change project name …

Read More »

Method Statement For Refrigerant Piping Installation And Pressure Testing

Below is the detailed procedure for the installation of refrigerant piping, we have included necessary tools requirements and the procedure of refrigerant method statement for installation and testing of pipes. Tool Boxes. Sandpaper or Sandcloth. Wire brush. Testing Tools. Nitrogen cylinder. Soldering Tools Razor Measuring Tape Hand Drilling Machine. adders / Scaffolding. Safety requirements tools such as safety shoes, safety …

Read More »

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE

TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that might be damaged by the test pressure shall be isolated, removed, bypassed or blanked off. Ensure temporary blank flanges …

Read More »

Method Statement For Hydrostatic Pressure Testing of Chilled Water Pipework

1. Purpose: The purpose of this method statement is to make sure that Hydro-static pressure testing of chilled water piping system is done safely as per client requirements and applicable standards. 2. Scope Of Work: This method statement covers the Hydro-static testing of CHW pipework at the project and to be followed for all piping works at site. Prior to the start of the …

Read More »