Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites
Read Complete Method
Maximum fall incidents take place due to improper use of scaffolds and ladders especially in construction industry when people are working at height. There are plenty of means used in construction sites for performing the work at height that include rigid stationary
Read Complete Method
You can download hazard identification, risk matrix and risk assessment templates from below links. These are the templates that you can use for conducting the risk assessments for any kind of activities related to any industry like manufacturing, production and construction etc.
Read Complete Method
Below is an important workplace health and safety procedure related to COSHH, that details the requirements for the establishment and maintenance of local registers for the control of chemicals and hazardous substances. Project head in coordination with all site staff and HSE
Read Complete Method
Risk management as understood by its name is process of managing the risks, that involves first identify, assess and prioritize the risks and then implement the coordinated measures and/or resources to eliminate, minimize and monitor the probability and impact of the unwanted
Read Complete Method
This document is prepared to provide a clear explanation about PTW issuance and to exemplify the PTW required activities at a construction or any other kind of project, the process involves detailed risk assessments on site activities conducted by main contractor in
Read Complete Method
The purpose of this document is to identify the environment, the activities and the associated risks for working over or near water and define the safety, health and environmental requirements with the aim to eliminate risks, or reduce it to as low
Read Complete Method
This document presents the Legionella Management & Prevention Plan (LMPP) for any type of public construction project. Project specific Legionella Prevention Plan (LPP) is prepared as per the LEED/ Estidama Requirement for Livable Buildings: Indoor Environmental Quality Requirement, Legionella Prevention. Normally the
Read Complete Method