Electrical Method Statements

Electrical method statement is used for safe implementation and construction of electrical works. Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources. The main section of a an electrical method statement for construction shall contain steps for installation and construction of the electrical works.

In addition to method statement you can find inspection and testing plan and inspection checklists for doing the work as part of method statement for electrical works.

Below you can find complete set of electrical method statements and also you can search from the top right section of this page. In addition you can also find complete set of editable electrical method statement in the form of editable files which are in Word / Excel formats and you only need to insert logo of your company and it is ready for submission and approval. Just visit download center from top main menu.

CCTV Camera Testing & Commissioning Procedure

Pan Tilt & Zoom or PTZ CCTV Camera

The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements of the client. Below is the list of equipment that shall be used for CCTV testing. Electrician tool …

Read More »

Method Statement for Installation of Access Control System Panel & Software

access control system panel installation method statement

Installation of Control Panel for ACS Access Control System. Mount the controller to a panel using screws. Connect the Ethernet, Service port and RS-485 connections based on your requirement. Connect the Tamper, Universal Inputs, card reader/Keypad and input/output connections based on the requirement. Connect the Expansion modules based on the requirement. Connect power supply connector of the ACS controller to a …

Read More »

Automatic Transfer Switch & Bypass Isolation Switch Method of Testing & Commissioning

Automatic transfer switch ATS Testing Procedure

The purpose of this method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant operators Manual and User’s guide. This procedure ensures the method used for testing and commissioning of Automatic transfer switch is correct and acceptable. After installing the switch check …

Read More »

Car Parking Management System Testing Commissioning Procedure

Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety rules. System units may be used only for their intended purpose, as specified by the manufacturer. Unauthorized modifications …

Read More »

Lead Acid Batteries Installation Operating Maintenance Instructions

Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover may occur. As the batteries are supplied charged, storage time is limited. In order to easily charge the …

Read More »

Main Sub-Main Distribution Boards Testing and Commissioning Procedure

distribution board testing procedure

Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the Contractor shall visually inspect the installation and satisfy that the equipment has been properly installed. Ensure that all …

Read More »

Main Distribution Board MDB Testing & Commissioning Procedure

main-distribution-board MDB Testing Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is ONLY interconnecting cable between Upstream …

Read More »

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset

General Requirements Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection. Ensure that the control switch is in the OFF position and emergency switch is pressed. Ensure that the panel has the correct fascia and labels. Note: All test sheets containing test values shall be forwarded to concern parties for records All round check of the genset …

Read More »