Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout
Read Complete Method
Following equipment shall be arranged: Hand tools Air Compressor Wire brush Slow speed drill with Fosroc MR4 mortar mixing paddle Finishing Sponge & rubber gloves SURFACE PREPARATION Mark out the defective area, remove loose sand cement materials and all contamination from screed
Read Complete Method
Download Method Statement for Anti Termite Treatment Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted
Read Complete Method
Download Method Statement for Installation of Reinforcing Bars Download Package Contains the Method Statement + Checklists for Reinforcing bars + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be
Read Complete Method
The purpose of this document is to lay down the systematic procedures for the various activities required for FORM WORKS to ensure that all works are carried out in accordance with the approved shop drawings and contract specifications. This civil method statement
Read Complete Method