Duct Works

AC Duct Cleaning Method Statement for HVAC Ducts & Accessories

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories

The purpose of this ac duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. HVAC duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting system. Following tools shall be arranged before starting the ac duct cleaning works of HVAC […]

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories Read More »

Duct Works, HVAC Method Statements
Method Statement For HVAC Ductwork Insulation and Acoustic Lining

Ductwork Insulation and Acoustic Lining Method Statement

This hvac method statement covers on site installation of ductwork insulation for pre fabricated ductwork systems manufactured from hot dipped galvanized steel sheet in line with the SMACNA requirements. Method statement describes best procedure to make sure that ductwork insulation and acoustic lining for prefabricated ducting, bracketing, and in line equipment installation and final connections

Ductwork Insulation and Acoustic Lining Method Statement Read More »

Duct Works, HVAC Method Statements
HVAC Method Statement for Grill Diffuser and Louver Installation

HVAC Method Statement for Grill Diffuser and Louver Installation

This hvac method statement covers the supply & installation of grilles, diffusers louvers & disc valves in line with project requirements as indicated in the approved shop drawings, reflected ceiling plans, specifications and manufacturer’s instructions. Plant and equipment required General tool box including screwdrivers Electric drill with appropriate bits Spirit level, water level Measurement tape

HVAC Method Statement for Grill Diffuser and Louver Installation Read More »

Duct Works, HVAC Method Statements
installation-of-Industrial-Exhaust-Fans

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans)

Below is a precise exhaust fan installation procedure that covers installation of Axial, Centrifugal and Propeller types of exhaust fans. This standing procedure step wise defines the method that will help to ensure that installation of axial / centrifugal / propeller fan’s, supports, vibration isolators and final connections is done as per project specifications. Also

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans) Read More »

Duct Works, HVAC Method Statements

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories Read More »

Construction Method Statements, Duct Works, HVAC Method Statements, Method Statements