Below are key roles and responsibilities for Project Environment Manager (PEM) and Environmental Officer (PEO) applicable for different types and sizes of the projects. Project Environment Manager reports directly to the Project Manager. Environment Manager has primary responsibility for managing all aspects
Read Complete Method
If you are looking for a professional construction method statement example then this page is helpful for you. We help you to understand the structure and requirements of a typical construction method statement. The information given is useful for engineers and other
Read Complete Method
This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in
Read Complete Method
What is a BMS system or Building Management System, in fact BMS is a microprocessor & computer based control system which is now installed in most of the buildings in order to control and monitor the installed equipment including all mechanical and
Read Complete Method
The work specified herein includes the design, documentation, furnishing, and installation of earth retention systems for excavations. The earth retention system shall be either singular or multiple stages comprised of soldier piles and laggings, sheet pile wall and bracing, raker or timber
Read Complete Method
Risk management as understood by its name is process of managing the risks, that involves first identify, assess and prioritize the risks and then implement the coordinated measures and/or resources to eliminate, minimize and monitor the probability and impact of the unwanted
Read Complete Method
Below we have given around 70 questions and answers that can be helpful for mechanical engineer interview. Q.1) What is the Unit of Heat? Units: BTU (British Thermal Units) 1BTU: It is the amount of energy required to raise 1 Degree Fahrenheit
Read Complete Method
Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related
Read Complete Method