General Safety HSE Considerations at a Construction Site

A task based risk assessment and mitigation strategy should be prepared for each activity of a project. All the work should commence as per safety regulations laid down in the legal regulations, contract specifications and project safety plan. Safety gears shall be used. All personal protective equipment shall be used as appropriate according to the nature of the job. For electrical works, …

Read More »

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects

This document presents the Legionella Management & Prevention Plan (LMPP) for the Project. The Project will be constructed on Plot No ————–, Project covering —————– m2 of site area and ————– m2 of total gross floor area. The main components of the building are: Basement floor – EST room / electrical room Ground floor – Class room / toilets/offices/play area …

Read More »

List Of Functional Tests For Electrical Works

Functional Tests For Electrical Works Below is a list of functional tests for the electrical system which should be conducted for performance, safety, reliability, maintainability and for compliance with the specified requirements. These tests shall be performed progressively on site in accordance with the Contract program to verify that the complete installation will meet the requirement of project specification. The …

Read More »

List Of Mandatory Tests For Transformers

The following routine tests specified in IEC726 shall be carried out at the manufacturer’s works on each and every transformer: a) Measurement of winding resistance b) Measurement of voltage ratio and check of vector relationship c) Measurement of impedance voltage (principal tapping), short circuit Impedance and load loss d) Measurement of no-load loss and current e) Separate source voltage withstand tests f) …

Read More »

List Of Common Tests For Diesel Generator Testing

The following site tests shall be carried out in order to determine whether the DG material and apparatus comply with the most specifications. Not less than seven days notice in writing shall be given to the Engineers in order that they may arrange to present if they so desire. The Contractors shall arrange to conduct as many tests together as are possible in …

Read More »