This document covers the sequence of activities for Fabrication, Erection and Installation procedure for Metallic Piping (Carbon Steels, Stainless Steels, Nickel Alloys) systems and to ensure the compliance to the above activities with the contractual applications, applicable standards and HSE requirements. Below
Read Complete Method
This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible
Read Complete Method
This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in
Read Complete Method
TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC REQUIREMENTS HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a
Read Complete Method
Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the
Read Complete Method
Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of
Read Complete Method