2025
					Mar
					
					
					
					
					
					22
				Variable Air Volume Installation Testing and Commissioning Method Statement
 
		
					This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV