Fire Protection Pipes and Fittings Installation Method Statement

Fire Protection Pipes and Fittings Installation Method Statement

This method statement covers the detailed procedure for installation of Fire Protection Pipes and Fittings. Procedure also defines the method used to ensure that the pipe work and fittings installation has been carried out as per the contract specification requirements. This method

2024
Dec
2

Disinfection and Flushing of Water Mains

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a

2024
Aug
29

Laboratory Gas Piping System Testing & Commissioning Method

This method statement covers all processes related to Testing & Commissioning of Laboratory Gas System, procedure is to be read in conjunction with the relevant ITP, outlining the responsibility and the quality verification to be performed by various parties. Project manager is

2024
Mar
7

Piping Installation, Welding & Fabrication Method Statement

Piping Installation, Welding & Fabrication Method Statement

TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC REQUIREMENTS HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a

2023
Sep
28

Underground Drainage Pipe Installation Method Statement

Underground Drainage Pipe Installation Method Statement

The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to

2023
Jul
24

Method Statement for Hydrostatic Testing of Metallic Pipework

The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at

2022
Jul
3

Sprinkler System Installation Procedure

Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss:

2022
Feb
20

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method of Statement

This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible