This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV
Read Complete Method
Below is mechanical method statement that is prepared in order to make sure that site installation of all types of Fan Coil Units and Packaged Air Conditioning Units and associated refrigerant pipework is done as per applicable requirements and manufacturer instructions. Procedure
Read Complete Method
A precise chilled water pipe insulation procedure is given below: Check all required approved chilled water pipe insulation materials are readily available on site. Install the pipe insulation according to this method statement, taking into consideration the manufacturer instructions as per material
Read Complete Method
TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that
Read Complete Method
This method statement covers the detailed procedure for installation of Fire Protection Pipes and Fittings. Procedure also defines the method used to ensure that the pipe work and fittings installation has been carried out as per the contract specification requirements. This method
Read Complete Method
Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a
Read Complete Method
This hvac method statement covers the supply & installation of grilles, diffusers louvers & disc valves in line with project requirements as indicated in the approved shop drawings, reflected ceiling plans, specifications and manufacturer’s instructions. Plant and equipment required General tool box
Read Complete Method
Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat Exchanger’s as indicated unless deviations
Read Complete Method