Category Archives: HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

Air Conditioner Installation Method Statement for Split Unit

Below is the a detailed ac installation method statement covering the installation of DX type split unit and packaged unit including the installation of outdoor units. All the split ac installation inspection and testing works shall be carried out in accordance with the project specifications and manufacturer’s installation instructions. AC installation works for split unit… Read More »

Chilled Water Pipe Installation Method Statement

This chilled water piping installation method of statement is prepared in order to outline the activities and the methods used for the installation of chilled water pipes and accessories. Carry out all project site installation activities in accordance with the contract details and in full compliance to the contract specifications and documents. All work within… Read More »

hdpe pipe installation method statement

Below is a classic method statement for the installation of HDPE piping network for domestic water supply system. Any plumbing engineer can get benefit from below method of statement for submission to consultant for a construction project. Material received at site shall be inspected and stored according to manufacturer recommendations. Store the hdpe piping material… Read More »

Chilled Water Flushing Procedure for Cleaning and Flushing of the Chilled Water Piping System

Cleaning and flushing of chilled water piping system is very important part of any HVAC project. During the installation of chilled water piping there are many sources from which debris, dust and even metallic parts enter the system, therefore before putting the system in operation cleaning and flushing is mandatory requirement as part of the… Read More »

Chilled Water Pipe Installation Method Statement

This method statement covers on site installation of pre fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water pipe system. By implementing this mechanical method statement on a project site contractor shall make sure that the chilled water piping system installation is as per project requirements i.e. specifications,… Read More »

BMS System Testing & Commissioning for DDC Panel and FCU

Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in the installation details of each instrument as well as instructions from supplier. Check… Read More »