2025
Aug
20

Chilled Water Pipe Installation Method Statement

Chilled Water Pipe Installation Method Statement

This method statement covers on site installation of pre fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water pipe system. By implementing this mechanical method statement on a project site contractor shall make sure that

2025
Aug
19

BMS System Testing & Commissioning for DDC Panel and FCU

Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in

2025
Aug
19

Ductwork Insulation and Acoustic Lining Method Statement

Method Statement For HVAC Ductwork Insulation and Acoustic Lining

This hvac method statement covers on site installation of ductwork insulation for pre fabricated ductwork systems manufactured from hot dipped galvanized steel sheet in line with the SMACNA requirements. Method statement describes best procedure to make sure that ductwork insulation and acoustic

2025
Aug
18

Aluminium HVAC Ductwork Installation Method Statement

Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices.

2025
Aug
18

Ductwork and Accessories Installation Method Statement

Ductwork & Accessories Installation Method Statement

Ducts in any HVAC system are used for distribution of air which can be for the purpose of cooling, providing fresh air or for the exhaust purpose. Commonly the HVAC ductwork is fabricated using GI sheets, but there are different types of

2025
Aug
15

Chilled Water Pumps Testing & Commissioning

Below is a precise testing and commissioning method statement for chilled water pumps on a project site. The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for

2025
Aug
14

Nitrogen Flushing of Air Conditioning and Refrigeration Systems

Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration equipment which require flushing of the system after exposing it to the atmosphere or during replacement of the refrigerant compressor. Responsibilities: 

2025
Aug
11

Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of chilled water pressurization unit through the guidelines contained herein so as to ensure that the job execution complies with