Pre-Commissioning Phase and Start-Up Phase System Pre-Commissioning Checks for Filter Before commissioning the system the following shall be ensured. The system has been checked against the approved installation drawings. Check that the upstream pressure at the filter inlet is more than 2.5 bar (38psi) during the rinse cycle. Check that the filter is mounted in the correct flow direction. Check …
Read More »Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation
Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings and BOQ related to the area of installation and ensure that required materials are available at site …
Read More »Plate Heat Exchanger Installation Method
Installation method statement for Plate Heat Exchanger Unless otherwise specified, all heat exchanger installation shall be in accordance to approved shop drawings and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Plate Heat Exchanger’s. Install Plate Heat Exchanger’s as indicated unless deviations to layout are approved on coordination drawings. Plate Heat Exchanger shall be installed on the …
Read More »Sprinkler System Installation Procedure
For sprinkler system pipe routing through walls and beams, make sure the appropriate sleeves are provided as per approval shop drawings and specification during the construction of structural elements. Fittings for the changes of direction or elevation shall be selected and installed as per the specification and approved shop drawings. Transfer the pipes from the stores to the areas which …
Read More »GRP Water Tank Installation Method Statement
Installation of GRP Water Tank will be carried out by specialist contractor base on the following steps and shall be done in accordance with the approved shop drawings and specification and approved material submittal ensure properly coordinated with the civil contractor for exact dimensions of the base plinth of the GRP water tank mountings and floor plan for the structural. …
Read More »uPVC High Pressure Water Supply Piping System Installation Procedure
Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place for installation reference. This also …
Read More »Firefighting Pump Installation Procedure
Select a location for the pumping unit (pump, base plate, coupling and driver) that will be clean, well ventilated, properly drained and provide accessibility for inspection and maintenance (see outline drawing for dimension) Outdoor installations may require protection from the elements particularly freezing. The suction supply system must provide the pump i.e. the suction tank location with its base or …
Read More »Water Spray Firefighting System Installation Method Statement
Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High Velocity Deluge Valve, OS & Y Valve Electrical Devices Pipe Wrenches Hammer Chisel Spanners Screw Drivers Files Drilling …
Read More »