FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement

This procedure covers installation and inspection of clean agent fire suppression system, the procedure is for FM 200 but can be useful for many other systems like Novec, Ansul etc. Quality of clean agent fire suppression system installation and materials at site will be ensured by project team consisting of a Project Manager, Project Engineers,… Read More »

Storage Tank Fabrication Erection and Testing Method Statement

This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in accordance with the project specifications to achieve satisfactory completion of the whole process.… Read More »

Lifting Work Safety Method Statement

This document covers the procedure to establish a method statement for all lifting activities for any kind of project especially laying of large transmission pipelines. The purpose of this document is to follow proper methodology and to carry out the activities and sequence of lifting works for laying of transmission pipelines at any kind of… Read More »

GCB Generator Circuit Breaker Installation Method Statement

Purpose of this method statement is to define the sequence of GCB generator circuit breaker installation and safe execution of the job. Procedure applies for GCB transportation, handling, and installation at electrical building / roof where these activities will be performed as per the project requirements. Arrange below mentioned equipment before installation of generator circuit… Read More »

Method Statement for Demolition Works

Below is precise method statement for demolition works that has been prepared to demonstrate the safe working method for the soft strip of internal fixtures/fixings and identified items, asbestos removal and demolition of the existing structure. This safework method is to be read in conjunction with provided drawings and Hazard surveys. This method statement is… Read More »

METHOD STATEMENT FOR INSTALLATION OF WIRING DEVICES & CEILING ROSE

PURPOSE The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for Installation of Wiring Devices & Ceiling Rose for Electrical System through the guidelines contained herein so as to ensure that the job execution complies with the requirements of contract specification and serves the… Read More »

Method Of Statement For Installation Of Fan Coil Units And Packaged Air Conditioning Units

Below is mechanical method statement that is prepared in order to make sure that site installation of all types of Fan Coil Units and Packaged Air Conditioning Units and associated refrigerant pipework is done as per applicable requirements and manufacturer instructions. Procedure defines the method that will be used to ensure that the FCU &… Read More »