2013
Apr
22
Testing & Commissioning Of VAV (Variable Air Volume)
VAV Pre-Commissioning Checking & Start up procedure Visual inspection to ensure that all DDC panels, sensors, actuators and other system devices are installed as per the approved point list, schematic drawings and specifications. Check the wiring of field devices with DDC panel