BMS System Testing & Commissioning for DDC Panel and FCU

Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in

2025
Jul
15

Building Management System BMS Installation Testing and Commissioning Method Statement

Installation Testing & Commissioning Of BMS Building Management System

Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site,

2024
Dec
25

What Is A Building Management System – BMS System

What is a BMS system or Building Management System, in fact BMS is a microprocessor & computer based control system which is now installed in most of the buildings in order to control and monitor the installed equipment including all mechanical and

2024
Jan
4

Termination of Fiber Optic Cables

Mass (Ribbon) Fusion Splicing

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be

2023
Oct
30

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects

This document presents the Legionella Management & Prevention Plan (LMPP) for any type of public construction project. Project specific Legionella Prevention Plan (LPP) is prepared as per the LEED/ Estidama Requirement for Livable Buildings: Indoor Environmental Quality Requirement, Legionella Prevention. Normally the

2023
Feb
26

Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case