Termination of Fiber Optic Cables

Mass (Ribbon) Fusion Splicing

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be

2023
Oct
30

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects

This document presents the Legionella Management & Prevention Plan (LMPP) for any type of public construction project. Project specific Legionella Prevention Plan (LPP) is prepared as per the LEED/ Estidama Requirement for Livable Buildings: Indoor Environmental Quality Requirement, Legionella Prevention. Normally the

2023
Feb
26

Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case

2018
Sep
30

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery

Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Below sequence of operation is for Variable Volume Type FAHU with Plate Heat Recovery system. The system shall be variable volume package Fresh Air Handling Unit. The scope of the unit shall consist of: Supply Side accessories Intake motorized damper Panel (Pleated) Filter Bag