2018
Aug
8

Method Statement for Bituminous Protective Coating Water Proofing

Water Proofing

It is essential to water proof a structure to prevent the seepage or penetration of water for its durability. Water proofing is required for many areas like basements, sunken portions, roofs, terrace gardens and expansion joints etc. Usually extensive waterproofing measures are added

2018
Aug
7

Method Statement for Assembling Erection Installation & Management of Mast Climber

Mast Climber Installation Method statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient management of Mast Climber including assembling, erection, and installation for efficient and effective utilization in execution of project works. Following equipment shall be arranged: Tower

2018
Aug
6

Method Statement for Installation of Roof Shading Louvers With Aluminium Cladding

installation method statement for Roof Shading Louvers

Before starting the construction work, ensure that all necessary work permit and safety requirements are complete. Supervisor to check that safety personnel is available to monitor the construction activity before start of work. HSE site engineer/office will ensure monitoring of the applicable

2018
Aug
6

Construction Method Statement for Building Construction Project

method statement for civil works

Method statement for construction project is a mandatory requirement even sometimes at the pre-qualification stage of a construction contractor. Any reputable building construction company will follow best construction methods in order to provide best quality of work.  Many old companies are always maintaining

2018
Aug
6

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy)

concrete repair shotcrete method statement

Concrete repair refers to modification of structure which is damage in its appearance or serviceability. It also involves to restore the structure partly or wholly, the pre-existing characteristics of serviceability, load-bearing capacity and if necessary, to improve its durability. Concrete structures deteriorate

2018
Jul
16

Method Statement for Ground Preparation of Excavations & Service Trenches

excavation-requirements

This document covers excavation and ground preparation for the roadway and service trenches and shall include all excavation, shaping and sloping necessary for the construction, preparation and completion of all subgrade, shoulders, slopes, gutters, intersections, approaches, entrances and trenches in conformity to

2018
Jun
22

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at

2018
Jun
21

Procedure for Installation of Steel Structure for Pump Rooms

Installation-of-Steel-Structure-method-statement

The following Method Statement describes the procedure and equipment required for the installation of steel structure for pump room. Following equipment shall be arranged: Lifting Equipment: Tower Crane (if available) To lift the beams/Purlins structure from ground floor to the roof where  the