Testing & Commissioning Of VAV (Variable Air Volume)

VAV Pre-Commissioning Checking & Start up procedure Visual inspection to ensure that all DDC panels, sensors, actuators and other system devices are installed as per the approved point list, schematic drawings and specifications. Check the wiring of field devices with DDC panel

2013
Apr
9

Method Of Statement for Testing & Commissioning Of Water Filtration System

The water filtration system is used to filter the suspended particles in the water and mostly in the residential and commercial building these are installed in the mechanical floor for the purpose of turbidity, odor and smell removal. Typically the water filtration