steel structure method statement

Steel Structure Building Construction Procedure

Steel Structure Building Construction Procedure

This procedure is useful for building construction based upon the project specifications for steel structure erection work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure works. The following items/equipments are basic requirements  for building construction of steel structure works at […]

Steel Structure Building Construction Procedure Read More »

Steel Structure & Fabrication
Installation-of-Steel-Structure-method-statement

Procedure for Installation of Steel Structure for Pump Rooms

The following Method Statement describes the procedure and equipment required for the installation of steel structure for pump room. Following equipment shall be arranged: Lifting Equipment: Tower Crane (if available) To lift the beams/Purlins structure from ground floor to the roof where  the area of installation is located. JCB or Fork Lift To bring the beams

Procedure for Installation of Steel Structure for Pump Rooms Read More »

Steel Structure & Fabrication
error: Content is protected !!
Scroll to Top