The purpose of this procedure is to follow proper activities of survey works for setting of grid lines & recording of existing ground level to carry out excavation and other works in all buildings in the project as per the technical specification
Read Complete Method
This Method Statement describes the works operation to undertake mass earthworks and sub grade construction that comply with the specified requirements for construction of new or widening of existing road under normal circumstances. The works covers all work in connection with the
Read Complete Method
The purpose of this procedure is to outline the Site clearance, Grubbing and Topsoil removal. The detailed guide will provide the clear steps undertaken to complete the process of the site clearance activities in a safe, systematic and efficient manner in compliance to the
Read Complete Method
On this page you can find typical project organization chart and job descriptions of the project team. The job descriptions include: Project Manager Senior Project Engineer Architectural Coordination Engineer Planning Engineer Quantity Surveyor Safety Officer Quality Control Engineer Structural Engineer Civil Engineer
Read Complete Method
This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel
Read Complete Method