The purpose of this roadworks method statement is to describe the activities, sequence and methods that are mandatory for carrying out the standard placement of subbase and road base for a project. The sequence of the road work activities shall remain in three
Read Complete Method
You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be
Read Complete Method
All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the
Read Complete Method
The Scope of this method statement covers all operations and associated activities involved in safe and efficient erection and construction of Loading Platforms including assembling and installation for efficient and effective utilization of Platforms in execution of project works. Following tools /
Read Complete Method
Hoist is a Rack and Pinion lift that is useful on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the building grows in height. Hoist has reliable electrical and mechanical
Read Complete Method
The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of
Read Complete Method
Demolition requires very careful and safe method in order to make sure that persons involved and other related parties are protected from any hazards. Demolition may affect the public, workers and adjacent structures. Therefore a well defined procedure is necessary that will
Read Complete Method
Below is the detailed method statement For installation of tiles on floors and walls. Semi-Dry Mortar method is useful for floor tiles works and for wall thin-bed adhesive method is useful. The aim of this method statement is to provide and maintain
Read Complete Method