Method of Statement for Traffic Diversion

This method statement introduces the proposed activities to be undertaken and acts as a general methodology for traffic diversion during road construction in the project site. This has been prepared to identify the work stages and the construction methodology for ensuring the works are carried out in compliance with contract requirements. This method statement describes […]

Method of Statement for Traffic Diversion Read More »

Civil Engineering Methods, Method Statements, Roadworks
Termite Control & treatment requirements

Standard Termite Control, Treatment and Application Requirements

This document covers termite control using approved insecticides executed in accordance with all applicable regulations in force in the country of project. Following documentation shall be submitted for the approval of consultant. Product Data: Treatments and application instructions Product Certificates: Signed by manufacturers of termite control products certifying that treatments furnished comply with requirements. Qualification

Standard Termite Control, Treatment and Application Requirements Read More »

Civil Engineering Methods, Method Statement for Civil Works
pebble washing method statement

Pebble Wash Do It Yourself

There are many advantages of doing the pebble wash i.e. it is natural material, thus soothing to your eyes. It will not fade and no need to apply paint forever. It is aesthetically beautiful and good for edging or contrast for flooring pattern. Below are the steps that are helpful for doing yourself the pebble

Pebble Wash Do It Yourself Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Method Statement for Oil Storage Tanks Calibration

Method Statement for Oil Storage Tanks Calibration

Tank Calibration is the process of determining the volumetric content of a tank per unit height of liquid. This procedure shall be intended for calibration of Oil Storage Tanks. The calibration shall be carried out by Optical Reference Line Method (ORLM) in accordance with API Standards i.e.  API 2550, Section 2B and ISO 7507, Part 2. Condition for Measurements

Method Statement for Oil Storage Tanks Calibration Read More »

Civil Engineering Methods, Method Statement for Civil Works, Technical Articles
Installation Method Statement for Settling Tank Shells Using Jack Lifting Method

Hydro and Water Fill Up Test for Settling Tanks

This test procedure shall be carried out to detect the leak in shell weld joints and to observe the load stabilization of liquid in interval level height. During the hydro test, all instrumentation shall be excluded to avoid the damage to instruments. Since the hydro test is to be carried out by produced water, ensure

Hydro and Water Fill Up Test for Settling Tanks Read More »

Civil Engineering Methods, Method Statement for Civil Works
Installation of Fencing

Method Statement for Installation of Fencing

Following Plant & Equipment to be arranged for the project fencing work. Tracked excavator Tractor and trailer Post driver Chainsaw Small tools (hammers, nail guns, wire cutters etc.) All personnel entering the site shall have received site safety induction and have attended a job toolbox talk. The Fencing Site Engineer will issue a Permit to Dig

Method Statement for Installation of Fencing Read More »

Civil Engineering Methods, Method Statement for Civil Works

Method Of Statement For Structural Excavation & Backfilling

Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice the nominal diameter of the pipe. Unless otherwise noted on the drawings, trenches

Method Of Statement For Structural Excavation & Backfilling Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements
excavation measurement procedure

Method of Measurement for Structural Excavations

Measurement of Structural excavation will be limited to excavation for foundation for bridges, retaining walls, box culverts or cross sectional area exceeding 1 sq. mtr, box culvert wing walls, head walls, toe walls and aprons, manholes, pump houses and sub-stations. For box culverts 1 sq. mtr or less, pipe culverts, storm sewers and ducts, measurement

Method of Measurement for Structural Excavations Read More »