A crawler mounted piling rig will be used to install bored cast in situ piles of dia 1200 mm. The procedure for the construction of bored piles, with temporary casing under bentonite / water support system, comprises the following key elements: Setting up at the pile location Installation of temporary guide casing Drilling of the pile borehole Recycling of Bentonite …
Read More »CCTV Camera Testing & Commissioning Procedure
The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements of the client. Below is the list of equipment that shall be used for CCTV testing. Electrician tool …
Read More »Method Statement for Installation of Access Control System Panel & Software
Installation of Control Panel for ACS Access Control System. Mount the controller to a panel using screws. Connect the Ethernet, Service port and RS-485 connections based on your requirement. Connect the Tamper, Universal Inputs, card reader/Keypad and input/output connections based on the requirement. Connect the Expansion modules based on the requirement. Connect power supply connector of the ACS controller to a …
Read More »Sample Quality, Health, Safety and Environmental Policy
Quality policy is a top level document that reflects the commitment of top management of a company to its intention of implementing the measures for achieving the quality and HSE targets and objectives. Below is a template or policy sample which can be useful for you to develop the QHSE policy for your company as well. You can also split …
Read More »Method Statement for Block laying Alignment & Jointing
Carry out one row of block work with ‘‘dry bond’’ (i.e. with out mortar, lay the blocks in position), the wall to establish the proper spacing of blocks. Lay mortar for full bed width and for a length of 3 blocks at a time, and to 12mm thickness. Lay one block at a time & gently pressing it in the mortar …
Read More »Automatic Transfer Switch & Bypass Isolation Switch Method of Testing & Commissioning
The purpose of this method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant operators Manual and User’s guide. This procedure ensures the method used for testing and commissioning of Automatic transfer switch is correct and acceptable. After installing the switch check …
Read More »Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation
Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings and BOQ related to the area of installation and ensure that required materials are available at site …
Read More »Car Parking Management System Testing Commissioning Procedure
Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety rules. System units may be used only for their intended purpose, as specified by the manufacturer. Unauthorized modifications …