Underground Drainage Pipe Installation Method Statement

The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to meet the quality and HSE requirements of the project. Method statement is applicable… Read More »

Well Point Dewatering System Method Statement

The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This method statement covers dewatering works at construction site having 6 meter basement structure,… Read More »

Construction Safety Procedure to Keep Children Away from Hazards

This construction safety instruction provides two-fold direction to assist in preventing children from entering the construction / mining site and being exposed to harm and to prevent underage personnel from working on the project. Procedure is applicable for all kind of projects especially in the context of children safety and child labor. Additional control measures… Read More »

HVAC System Volume Control & Fire Damper Installation Method Statement

Unless otherwise specified, all the dampers and duct accessories installation shall be according to the approved shop drawings and contract mechanical specifications. Drawings, plans, schematics and diagrams indicate general location and arrangement of ductworks, install the dampers as indicated unless deviations to the layout are approved on coordination drawings. This duct accessories and dampers installation… Read More »

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI)

This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework. The mechanical method statement defines the method that will be used to ensure… Read More »

Method of Statement for Installation of Power / Electrical Bus bar

Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels.  Before starting the installation of power electrical busbar following tools shall be arranged: Tower Crane / Fork Lift for transporting Busbar Chain Block Pulley (Suitable Capacity) Portable hand tolls Portable Drilling Machine… Read More »

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case of any contradictory matters that may arise. Purpose of this method is to… Read More »

Mobile Heavy Equipment Recovery Standard Procedure

The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use of heavy mobile recovery equipment, although some of the general safety principles may… Read More »