Mobile Heavy Equipment Recovery Standard Procedure

The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use of heavy mobile recovery equipment, although some of the general safety principles may… Read More »

Pedestrian Walkway Concreting – Broom Finish Concrete

The purpose of this concreting method statement is to define the guidelines for the preparation of the concreting work for pedestrian walkway (broom finish) and to ensure the safe execution of all the concrete works during construction phases of the project so as to eliminate the risk of injury or damage to personnel, equipment and… Read More »

Glazed Partitioning Method Statement for Glass Office Partitions

Below is a precise method of statement for the installation of glazed partitions or glass office partitions. The first section gives the pre-installation requirements, we strongly recommend that all sections of this document be read thoroughly before site installation commences. It is important that the relevant Health and Safety legislation be observed at all times… Read More »

Repair of Painting Works on Beam, Column, Slabs, and Wall

The purpose of this method statement is to cover the steps for repairing of painting works on beam, column, slabs, and walls etc. Overall painting subcontractor is responsible for implementation of this procedure on a project or building. Below is list of necessary tools and equipment’s. Gondola for exterior works Water jet pump Scraper Paint… Read More »

Method Statement for Excavation & Backfilling for Open Foundations / Footings

Below is a brief method statement that details general procedures to be followed for excavation & backfilling of foundations, Sub-structures & Trenches for any type of the construction and road project. The method covers survey works, excavation, backfilling, compaction and area cleaning after the completion of works. Separate work method statement, will be generated by… Read More »

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related standards and codes: ASTM A416/A416M: Standard Specification for Steel Strand, Uncoated Seven-Wire for… Read More »

Temporary Works Standard Safety Procedure

The purpose of this procedure is to provide safework instruction for the safe erection, dismantling and structure design of temporary works. Definitions and Abbreviations Temporary Works: Any temporary structure required to construct a permanent structure or used to support a permanent structure. TWC: Temporary Works Coordinator TWD: Temporary Works Designer TWDC: Temporary Works Design Checker… Read More »

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on… Read More »