Termination of Fiber Optic Cables

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be responsible for the overall implementation of this method statement, and to ensure that… Read More »

Method Statement for Dry Lean Concrete – Roadworks

Below road works method statement covers the construction of Dry Lean Cement concrete sub-base for cement concrete pavement in accordance with requirement of roadwork specifications in conformity with the lines, grades and cross sections shown on the drawings and or as directed by the consulting engineer. The road construction shall be done in compliance with… Read More »

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject to a minimum thickness of 75 mm and max. of 200 mm. References… Read More »

Method Statement for Concrete Sampling and Testing

This method statement is applicable for collecting samples for concrete before and during concrete pouring activities and doing the standard tests. The aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities… Read More »

Method Statement for Split AC Installation of DX Split and Packaged Units

Below is the a detailed split ac installation method statement covering the installation of DX Split Units and packaged units including the installation of outdoor units. All the split ac installation inspection and testing works shall be carried out in accordance with the project specifications and manufacturer’s installation instructions. AC installation works including indoor and… Read More »

Safe Work Procedure Working near Water or Over Water

The purpose of this document is to identify the environment, the activities and the associated risks for working over or near water and define the safety, health and environmental requirements with the aim to eliminate risks, or reduce it to as low as is reasonably practicable. This general procedure applies to all projects which are… Read More »

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects

This document presents the Legionella Management & Prevention Plan (LMPP) for any type of public construction project. Project specific Legionella Prevention Plan (LPP) is prepared as per the LEED/ Estidama Requirement for Livable Buildings: Indoor Environmental Quality Requirement, Legionella Prevention. Normally the requirements are given within the project specifications, and contractor is responsible to develop… Read More »

Method Statement for Swimming Pool and Jacuzzi Installation

This construction methodology for the swimming pool and jacuzzi installation consists of descriptive details and the installation sequence for guiding the employees of a pool installation company. Scope of work covers the supply and installation of the Swimming Pool and Jacuzzi. All materials used are in accordance with contract specifications and shall be submitted for… Read More »