Emergency Lighting Central Battery System Testing and Commissioning

This method of statement is to provide guidance in carrying out the testing and commissioning of central battery system which has been installed at the project, in accordance with the approved Project Quality Plan, contract specifications and Commissioning plan. Purpose of this method of statement is to control the testing and commissioning activities for the… Read More »

Electrical Installation Method Statement for Central Battery Emergency Lighting System

This document describes the electrical installation methodology for emergency lighting central battery system in any kind of project. Following this electrical installation method shall ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and project documents… Read More »

Water Filtration System Testing and Commissioning Method Statement

This method statement is applicable for Testing & Commissioning of Multimedia Water Filtration System which is part of domestic water supply system. The water filtration system is used to filter the suspended particles in the water and mostly in the residential and commercial building these are installed in the mechanical floor for the purpose of… Read More »

Variable Air Volume Installation Testing and Commissioning Method Statement

This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV installation and testing activities: Mechanical Tool Box Electric Drill Machine Step Ladders Threading… Read More »

FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement

This procedure covers installation and inspection of clean agent fire suppression system, the procedure is for FM 200 but can be useful for many other systems like Novec, Ansul etc. Quality of clean agent fire suppression system installation and materials at site will be ensured by project team consisting of a Project Manager, Project Engineers,… Read More »

Storage Tank Fabrication Erection and Testing Method Statement

This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in accordance with the project specifications to achieve satisfactory completion of the whole process.… Read More »

Lifting Work Safety Method Statement

This document covers the procedure to establish a method statement for all lifting activities for any kind of project especially laying of large transmission pipelines. The purpose of this document is to follow proper methodology and to carry out the activities and sequence of lifting works for laying of transmission pipelines at any kind of… Read More »