Safety Instructions for the use of Compressed Air Tools and Units

The purpose of this safety procedure is to provide instruction and direction as to what the correct usage of compressed air tools and equipment should be to minimize the risk of injury to personnel and assets. Below procedure is applicable for all kind and size of projects, but additional control measures may be required depending… Read More »

Aluminum Sliding Doors Installation Method of Statement

Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is complete and method of aluminium door fixation, details of aluminium units is approved… Read More »

Occupational Health and Safety Procedure for Mobile Elevated Work Platform

Below is a precise procedure that provides instructions for the safe use of Mobile Elevated Work Platforms (EWP), applicable for all kind and size of projects. Overall project director and project HSE team is having responsibilities for the implementation of this occupational health and safety procedure and also relevant applicable standards i.e. ISO 16368:2024 –… Read More »

Method Statement for Testing & Commissioning of Foam System

Below is a precise foam system testing procedure that is applicable for testing and commissioning of foam fire suppression system. This page is not covering all sections of a complete method statement template but only operational sections. Before commissioning the foam system the following shall be ensured. Fire suppression system has been checked against the… Read More »

Construction Methodology for Underground Services Protection

Purpose of below safety method statement is to provide instructions for ensuring the safe operations involved with ground penetrations so that underground services are not damaged and also to ensure the safety of workers. Overall the project manager is having responsibilities for the implementation of this standard safety procedure. Hazard Identification and Risk Assessment a)… Read More »

Plastering Method Statement

Below is a precise plastering work method statement that is very useful for civil engineers to understand how best quality plaster work can be done. This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project civil specifications. Below are the plastering tools or plastering equipment involved in… Read More »

Flooring Installation Method Statement for Marble and Granite Tiles Installation

This flooring installation method statement covers the detailed procedure to be followed for supply & installation of Marble and Granite tiles on floor, stairs, walls and counters and other areas as per the schedule of finishes for the project. Civil site engineer shall ensure that all materials shall be delivered to site complying with approved… Read More »

HVAC Chilled Water Pump Installation Method Statement

Below is a precise hvac method statement that covers the CHW chilled water pump Installation Alignment and Balancing works applicable for any kind of mechanical project. Before start of work examine areas, equipment foundations, and conditions for compliance with requirements for installation and other conditions affecting chilled water pump performance. Do not proceed with pump… Read More »