Aluminium HVAC Duct Installation Method Statement

Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices. The procedure gives details of how the work will be carried out and… Read More »

Possible Causes of Road Crack and Defect – Road Maintenance Inspection Guide

Below you can find some major causes of road crack and road defects. The page also provides what are the effects if these road defects are not properly addressed. Alligator Cracking Alligator cracking is a series of interconnecting cracks creating interconnected patterns on the road. The cracks start at the bottom of asphalt surface and… Read More »

Steel Structure Building Construction Procedure

This procedure is useful for building construction based upon the steel structure erection work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure work. The following items/equipments are basic requirements  for building construction of steel structure works at a large scale… Read More »

Road Pavement Construction Inspection Checklist

General road construction site inspection checks: Contractor has all necessary permits to work in road where applicable, i.e. Construction Permit, Insurance, Bonding etc. available. Safety to public considered: (barricades, covered walkways, etc. provided) Barricades available around excavations in street. Barricades available around stockpiled materials in street. Adequate detour signs to get the public through or… Read More »

Aluminium Cutter Machine Operation Work Instructions

This page provides you steps for using the aluminium cutter machine. The instructions are explained using the images to understand easily. When cutting aluminium profiles, please wear hand gloves, ear muffs and safety glasses. Do not wear any kind of jewelry (rings, watches, bracelets etc.) in order to prevent scratching the aluminum end products and… Read More »

Control of Engineering Documents Procedure for Quality Management System

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects are duly registered, reviewed, approved and distributed in a controlled manner. Procedure of… Read More »

Lock Out Tag Out LOTO Construction Safety Isolation Procedure

This lock out tag out procedure shall help companies to establish a standard for the safe isolation of machinery, equipment and any other energy source which may need isolation by means of a lock-out tag-out LOTO system. Overall the project head / project manager is responsible for the implementation of this standard  hse procedure as… Read More »