Control of Engineering Documents Procedure for Quality Management System

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects are duly registered, reviewed, approved and distributed in a controlled manner. Procedure of… Read More »

Lock Out Tag Out LOTO Construction Safety Isolation Procedure

This lock out tag out procedure shall help companies to establish a standard for the safe isolation of machinery, equipment and any other energy source which may need isolation by means of a lock-out tag-out LOTO system. Overall the project head / project manager is responsible for the implementation of this standard  hse procedure as… Read More »

Preventive Maintenance & Breakdown Maintenance Plans and Procedures [Download]

If you are looking for preventive maintenance & breakdown maintenance program, plans, schedules and procedures then this is right place. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of electrical and mechanical equipment’s and systems. Preventive maintenance is an essential part of any facility management works.… Read More »

Aluminium Fabrication Work Instruction for Curtain Walls

Below is step wise method for fabrication of aluminum curtain walls for aluminium fabrication work. If you work in an aluminum and glass factory then this work instruction will help you to achieve good quality aluminium work. Arrange following materials and tools before start of work. Drilling Machine, Screws & Drill Bit Knife Cutting Lists… Read More »

Pipe Welding Work and the Welder’s Qualification Test Procedure

Below method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes implementing the company commitments for achieving the best quality of welding works. The document outlines the method for executing welding process for pipe work and welding procedure qualification test for welders. This method statement covers… Read More »

Roof Trusses Fabrication Safe Work Method Statement SWMS

The sub-contractor or person doing the work is responsible for carrying out a particular action, as listed in this safe work method statement SWMS. The supervisor is responsible to ensure that the sub-contractor or person doing the work is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the… Read More »

Method Statement for an EPC Construction Project

This method statement for construction project consists of the following sections. 1. General Execution Strategy 2. Details of Design and Engineering Plan 3. Material Management Planning and List of Long Delivery Material 4. Construction and Installation Activity 5. Safety and Environmental Plan 6. Quality Assurance Planning Section 1. General Execution Strategy Contractor will be responsible… Read More »

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

This method statement procedure covers the Testing and Commissioning of sprinkler and firefighting standpipe systems installed at project, this will also ensure proper workmanship and that the work conforms to contract documents and applicable NFPA regulations. Commissioning manager will have the all the responsibility for the execution  of the Testing and Commissioning  activities, quality  and… Read More »