The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated
Read Complete Method
The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed
Read Complete Method
This procedure is useful for building construction based upon the steel structure erection work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure work. The following items/equipments are