Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject to a minimum thickness of 75 mm and max. of 200 mm. References… Read More »

Road Construction Method Statement

Below is very brief road construction work method statement that outlines the complete process from laying the sub base to the laying of asphalt to achieve final product or outcome. The scope for pavement for the road construction consists of sub-base of granular material, road base of crusher run, asphaltic concrete binder course and asphaltic… Read More »