Wet Mix Macadam

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject to a minimum thickness of 75 mm and max. of 200 mm. References […]

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base Read More »

Civil Engineering Methods, Method Statements, Roadworks
roadworks sub base and road base compaction

Method Statement for Placement of Sub Base and Road Base

The purpose of this roadworks method statement is to describe the activities, sequence and methods that are mandatory for carrying out the standard placement of subbase and road base for a project. The sequence of the road work activities shall remain in three stages i.e. placing of lower sub base, placing of upper sub base and

Method Statement for Placement of Sub Base and Road Base Read More »

Civil Engineering Methods, Roadworks
error: Content is protected !!
Scroll to Top