Tag Archives: roadworks

Method Statement for Dry Lean Concrete – Roadworks

Below road works method statement covers the construction of Dry Lean Cement concrete sub-base for cement concrete pavement in accordance with requirement of roadwork specifications in conformity with the lines, grades and cross sections shown on the drawings and or as directed by the consulting engineer. The road construction shall be done in compliance with… Read More »

Road Construction Method Statement

Below is very brief road construction work method statement that outlines the complete process from laying the sub base to the laying of asphalt to achieve final product or outcome. The scope for pavement for the road construction consists of sub-base of granular material, road base of crusher run, asphaltic concrete binder course and asphaltic… Read More »

Method Statement for Placement of Sub Base and Road Base

The purpose of this roadworks method statement is to describe the activities, sequence and methods that are mandatory for carrying out the standard placement of subbase and road base for a project. The sequence of the road work activities shall remain in three stages i.e. placing of lower sub base, placing of upper sub base and… Read More »