Category Archives: Electrical Method Statements

Electrical method statement is used for safe implementation and construction of electrical works.

Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.

The main section of an electrical method statement for construction shall contain steps for installation and construction of the electrical works and components.

We are providing editable method statement swms packages, you can check a sample of  free electrical method statement and after that decide about downloading the full package.

In addition to method statement you shall find inspection and testing plan, inspection/testing checklists and risk assessments for doing the work as part of method statement for electrical works.

Below you can find complete set of electrical method statements and also you can search from the top left section of this page.

In addition you can also find complete set of editable electrical method statement in the form of editable files which are in Word / Excel formats and you only need to insert logo of your company and it is ready for submission and approval.

Click here to download electrical method statements.

Installation Procedure for Vehicle Induction Loop System

The preformed or saw-cut vehicle induction loop shall be buried in Entry and Exit drive lanes as per the approved shop drawings and the project requirements. The loop shall be a continuous run of wire that enters and exits from the same point and end up at the loop detector which powers up the loop.… Read More »

Installation Method Statement Procedure for Car Park Boom & Barrier Arms

The Vehicle loop cables shall be laid on the drive lane for entry & exit locations, to detect vehicle presence at drive lanes. In addition, safety loops shall detect vehicle exit on the drive lane to command barrier to lower down its arm. The Vehicle loop detectors’ cables shall be pulled up to barrier locations… Read More »

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves

SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS  Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED: The wrap around heat shrinkable cable sleeves used shall be as per approved… Read More »

Download Method Statement For Testing & Commissioning Of Smoke Management System

Download Method Statement For Testing & Commissioning Of Smoke Management System  Download Package Contains the Method Statement + Checklist for Testing &  Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of… Read More »

Sequence Of Operation For Electrical, Low Current & ELV Systems

Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire alarm panel will be monitored by the DDC controller to provide a system healthy, fault and alarm. All information shall be displayed on the BMS Supervisor. All MCC and DDC control panels will be linked to the Fire Alarm… Read More »

Download Method Statement For Installation Of Light Fittings Luminaries Exterior & Interior

Download Method Statement For Installation Of Light Fittings Luminaries Exterior & Interior  Download Package Contains the Method Statement + Checklist for Installation + Inspection & Testing Plan  You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in… Read More »

Testing and Commissioning Procedure For Structured Cabling System SCS

Below is a complete method statement that can be followed for performing testing & commissioning of structured cabling system including voice, telephone and data systems. Copper Cable Testing & Commissioning Method Statement Overview: Characterizing cabling provides useful data for the support of future equipment application. The verification of the transmission performance of cable plant through field… Read More »

Download Method Statement for Disabled Toilet Alarm System DTA Testing & Commissioning

Download Method Statement for Disabled Toilet Alarm System DTA Testing & Commissioning   Download package contains the Method Statement + Checklists for Pre Commissioning + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval… Read More »