Download Smoke Management System Method Statement

The Smoke Management System shall be installed, tested, balanced, commissioned, and handed over by qualified mechanical, electrical, fire protection, and commissioning specialists in accordance with NFPA 92, BS EN 12101, ASHRAE requirements, approved shop drawings, project specifications, Civil Defense requirements, and manufacturer recommendations.

Successful completion of airflow verification, pressurization testing, smoke extraction testing, fire alarm integration, cause and effect validation, emergency power testing, and user acceptance testing will ensure that the system performs reliably during emergency situations and provides safe smoke control and occupant protection.

Download Package Contains:

  • Method Statement
  • Checklist for Testing &  Commissioning
  • Inspection & Testing Plan
  • Risk Assessment

You only need to change project name and insert logos etc. and the same shall be ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

Method Statement For Smoke Management System Installation T&C

The files are in Word/Excel formats and instantly available.

 Download Method Statement with Checklists, ITP & Risk Assessment

Click below link and Download Instantly.