Category Archives: Electrical Method Statements

Electrical method statement is used for safe implementation and construction of electrical works.

Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.

The main section of an electrical method statement for construction shall contain steps for installation and construction of the electrical works and components.

We are providing editable method statement swms packages, you can check a sample of  free electrical method statement and after that decide about downloading the full package.

In addition to method statement you shall find inspection and testing plan, inspection/testing checklists and risk assessments for doing the work as part of method statement for electrical works.

Below you can find complete set of electrical method statements and also you can search from the top left section of this page.

In addition you can also find complete set of editable electrical method statement in the form of editable files which are in Word / Excel formats and you only need to insert logo of your company and it is ready for submission and approval.

Click here to download electrical method statements.

Car Parking Management System Testing Commissioning Procedure

Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety rules. System units may be used only for their intended purpose, as specified… Read More »

Lead Acid Batteries Installation Operating Maintenance Instructions

Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover may occur. As the batteries are supplied charged, storage time is limited. In… Read More »

Main Sub-Main Distribution Boards Testing and Commissioning Procedure

Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the Contractor shall visually inspect the installation and satisfy that the equipment has been… Read More »

Main Distribution Board MDB Testing & Commissioning Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is… Read More »

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset

General Requirements Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection. Ensure that the control switch is in the OFF position and emergency switch is pressed. Ensure that the panel has the correct fascia and labels. Note: All test sheets containing test values shall be forwarded to concern parties for records All… Read More »

Structured Telephone & Data Cabling System Testing Requirements

All cables and termination hardware shall be 100% tested for defects in installation and to verify structured cabling system performance under installed conditions according to the requirements of ANSI/TIA 1152, ANSI/TIA-568 C.2 and IS&T. All pairs of each installed cable shall be verified prior to system acceptance. Any defect in the cabling system installation including… Read More »

Installation Procedure for Ticketing Dispenser

Ticketing dispenser shall be installed in retail parking entry point. Access to the car park will be granted via ticketing dispenser with bar code parking ticket. Foundations shall be prepared as per the recommendations of manufacturer. The foundation dimensions shall be of HxWxD: 600x600x600mm. The concrete to be a design mix in accordance with BS… Read More »

Installation Procedure for Vehicle Induction Loop System

The preformed or saw-cut vehicle induction loop shall be buried in Entry and Exit drive lanes as per the approved shop drawings and the project requirements. The loop shall be a continuous run of wire that enters and exits from the same point and end up at the loop detector which powers up the loop.… Read More »