mdb

main-distribution-board MDB Testing Procedure

Main Distribution Board MDB Testing & Commissioning Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is […]

Main Distribution Board MDB Testing & Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Technical Requirements of Busbars And Current Carrying Parts of LV Switchgear

The manufacturing of the busbar system shall comply to the latest edition of BS 158 and BS 159. All busbars and current carrying parts shall be manufactured to carry a current density of not more than 1.55 A/mm² and shall be capable of carrying normal current continuously without the temperature rise of any part exceeding

Technical Requirements of Busbars And Current Carrying Parts of LV Switchgear Read More »