Steel Bar Rebar Reinforcement Cutting and Bending Procedure

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or […]

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Road Pavement Construction Inspection Checklist

Standard Road Maintenance Routine Requirements

The works mentioned in this Section shall apply to maintenance of road and shall be carried out manually or by machinery in such a way that the quality of end product meets the specified requirements. Whenever the Specification is not clear, good engineering practice shall be applied to the satisfaction of the consulting engineer. This

Standard Road Maintenance Routine Requirements Read More »

Civil Engineering Methods, Quality Management, Roadworks
Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating manual and cartridge operating manual. Hazard Identification and Risk Assessment The introduction of

Explosive Power Tools Operation Safety Instructions Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Technical Articles

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs and approved material submittals. Prior to installation of drainage accessories, the supervisor  and

Drainage Accessories Installation Method of Statement Read More »

Plumbing Method Statements
Standard Procedure for Management of Construction Equipment Project Plant Assets

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when suitable hire/rental equipment is not available in the market place, and where an

Standard Procedure for Management of Construction Equipment Project Plant Assets Read More »

Civil Engineering Methods, Preventive Maintenance, Project Planning, Roadworks

Office Safety Procedure for Workplace Safety Management

The purpose of this office hse procedure is to ensure that all offices are designed to mitigate risk and maintained to ensure the safety of staff and visitors. This office safety procedure is applicable for all kind of head/corporate/admin offices including project site offices to maintain good construction safety culture. Overall the office/project manager is

Office Safety Procedure for Workplace Safety Management Read More »