Method Statement for Testing & Commissioning Of Foam System

Before commissioning the foam system the following shall be ensured. The system has been checked against the approved installation drawings. The pressure testing of the pipes are completed. The installation of foam bladder tank, Deluge valve, Ratio Flow Controller, Isolation valves, associated pipe works, and Controller Panel completed. The installations of foam / water open sprinklers […]

Installation of Marble and Granite Tiles on floor, stairs, walls and counters

This method statement covers the detailed procedure to be followed for Supply & Installation of Marble and Granite on floor, stairs, walls and counters and other areas as per the schedule of finishes for the project. MARBLE INSTALLATION:   Marble Delivery:   Site Engineer shall ensure that all materials shall be delivered to site comply […]

Electrical Method Of Statement For Installation & Termination of Cables and Wires

This method statement for electrical work shall help you understand the requirements before and during the cable s and wires pulling process. The document is very helpful for MEP QA/QC engineers to develop the professional electrical method statement for their project. Below is the list of equipment / Tools required for installation of cables and […]