Download Method Statement for Coring & Cutting of RCC Walls

Download Method Statement for Coring & Cutting Of RCC Walls

 Download Package Contains the Method Statement +

Checklists for Cutting +

Inspection & Testing Plan +

Risk Assessment

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

Method Statement for Coring & Cutting Of RCC Walls

The files are in Word/Excel formats and instantly available after you pay the cost of only 2.49$.

 Download Method Statement with Checklists, ITP & Risk Assessment

Click Below “Buy Now” link and Download Instantly.




secure-payment-with-paypal