The purpose of this procedure is to identify the key elements which need to be considered when setting up a new construction site and implementing the administrative arrangements for the start up of any project. Prior to commencement on site due consideration
Read Complete Method
PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management
Read Complete Method
The term QHSE is used as abbreviation of Quality, Health, Safety and Environment in most parts of the world. Sometimes environment is replaced by environmental. These four components combine together to form an integrated corporate management approach and according to this approach all workplace accidents
Read Complete Method
This method statement introduces the proposed activities to be undertaken and acts as a general methodology for traffic diversion during road construction in the project site. This has been prepared to identify the work stages and the construction methodology for ensuring the
Read Complete Method
Project job descriptions for different job titles are prepared and implemented as part of a good quality management system. Before start of a project normally organization chart is prepared and submitted for the approval of the client and consultant. Some clients provide
Read Complete Method
The Standard Proctor Test is a laboratory test used to determine the optimum water for a given compaction energy for a given soil. This test is especially useful when determining the relationship between water content and the dry unit weight of soils to
Read Complete Method