Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety
Read Complete Method
Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat Exchanger’s as indicated unless deviations
Read Complete Method
Pre-Commissioning Procedure Before starting the commissioning activities check and ensure that bypass Terminal Reheat units are installed as per the approved shop drawings and manufacturer’s instructions and approved. Check that sensing grids tubing connection from the grids to the transducers are correct
Read Complete Method
Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover
Read Complete Method
Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings,
Read Complete Method
Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of
Read Complete Method
The Project Manager is the overall responsible person for the process implementation of the works. The Construction Manager/Site Engineer will be responsible for all construction activities at the site and will directly supervise through erection supervisor/ skilled workmen the work at site.
Read Complete Method
Below is a precise method statement for fire pump installation, each project will have its own specific method of statement for installation of fire pump. Follow the manufacturer’s instructions while installing the fire pump. Pump shall be stored on a flat surface
Read Complete Method