Containers shall be designed, fabricated, tested and marked (or stamped) in accordance with the Regulations of the U.S. Department of Transportation (DOT), the “Rules for the Construction of unfired Pressure Vessels”, Section VIII, Division 1, ASME Boiler and Pressure Vessel Code, or
Read Complete Method
Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High
Read Complete Method
Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the
Read Complete Method
Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded
Read Complete Method
The Condensate Water Filter (Side Stream/ Multimedia) are compact filtration packages for the removal of grit, airborne particles and scale from cooling tower water in order to avoid system fouling. A licensed and/or trained/experienced plant electrician and millwright-pipe fitter should install this
Read Complete Method
These instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended
Read Complete Method
SCOPE OF THIS DOCUMENT COVERS BELOW MENTIONED BALANCING VALVES: DM921 & DMG921 DOUBLE REGULATING VALVE (DRV) DM931 & DMG931 DA931 & DAG 931 VARIABLE ORIFICE DOUBLE REGULATING VALVE (VODRV) DM941 & DMG 941 DA941 & DAG941 FIXED ORIFICE DOUBLE REGULATING VALVE (FODRV)
Read Complete Method
Following is a precise chemical cleaning procedure that will ensure the internal and external cleanliness and protection of the pipes before the piping process unit is put into service. Scope of work covers all the horizontal and vertical pipelines through all the
Read Complete Method