The following possible risks or problems are identified with the activities involved with pile execution. Survey – Out of Positioning of the Pile The pile position shall be cross-checked by the Engineer, Contractor and Sub Contractor before the installation of pile. If
Read Complete Method
Subsequent to the completion of the pile drilling, the borehole depth will be checked and verified versus the depth given on daily piling sequence and pile data. Only after borehole depth check can the cage be lowered into the borehole. A reference
Read Complete Method
Below is a brief method statement of piling work that can be used for any kind of project piling works. A crawler mounted piling rig will be used to install bored cast in situ piles of dia 1200 mm. The procedure for
Read Complete Method
The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements
Read Complete Method
Installation of Control Panel for ACS Access Control System. Mount the controller to a panel using screws. Connect the Ethernet, Service port and RS-485 connections based on your requirement. Connect the Tamper, Universal Inputs, card reader/Keypad and input/output connections based on the requirement.
Read Complete Method
Concrete Blocks are mostly used building material in all parts of the world. Below is a brief method statement that you can utilize for concrete blocks laying alignment & jointing. Blockwork is major activity that requires precise alignment and joining because if
Read Complete Method
The purpose of this method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant operators Manual and User’s guide. This procedure ensures the
Read Complete Method
Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop
Read Complete Method