Tag Archives: Piling Problems

Piling Problems and Risks During Execution Works

The following possible risks or problems are identified with the activities involved with pile execution. Survey – Out of Positioning of the Pile The pile position shall be cross-checked by the Engineer, Contractor and Sub Contractor before the installation of pile. If any out of position of the pile (more than the allowable tolerance) has… Read More »