2018
Jan
15
Method Statement for Pile Reinforcement and Concrete Casting
Subsequent to the completion of the pile drilling, the borehole depth will be checked and verified versus the depth given on daily piling sequence and pile data. Only after borehole depth check can the cage be lowered into the borehole. A reference