Method Statement for Preparation and Construction Of Cast In Place Concrete Works for Substructures

The purpose of this civil work method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for substructures in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. Click Here to download Full Civil Method Statement… Read More »

Method Statement for Pile Reinforcement and Concrete Casting

Subsequent to the completion of the pile drilling, the borehole depth will be checked and verified versus the depth given on daily piling sequence and pile data.  Only after borehole depth check can the cage be lowered into the borehole.  A reference site datum level will be given to ensure the correct positioning of the… Read More »